读知识>英语词典>power hammer翻译和用法

power hammer

英 [ˈpaʊə(r) ˈhæmə(r)]

美 [ˈpaʊər ˈhæmər]

网络  动力锤; 电锤

化学

英英释义

noun

  • a power tool for drilling rocks
      Synonym:hammer

    双语例句

    • Determining the motor power of a hammer crusher
      锤式破碎机电动机功率的确定
    • Usually the compressive force is in the form of hammer blows using a power hammer or a press, as shown in Fig.4.1.
      通常压力都是以由如图4.1所示的动力锤或压力机提供的锤击形式出现。
    • 12t drop hammer test machine research on energy efficiency and arrangement of power system of hydraulic crusher with dropping hammer
      12t落锤试验台液压落锤式碎石机动力系统配置及能量效率
    • Different from past single-pipe engineering, the construction of long-distance water diversion project is complicated and lots of boundary conditions, and the analysis of water power condition consequently becomes one of the most important water hammer study.
      不同于以往单管的输水工程,此类工程的结构更复杂,边界条件更多,其水力状态的分析也成为了水锤研究的一个重要方向。
    • In industrial piping systems, such as the heat exchanging and circular system of the nuclear power station, and the rocket propellant piping, etc* The water hammer take placed frequently for the opening and closing of the valve.
      在工业管道中,如:核电厂的热力交换和循环系统,火箭推进剂输送系统等等,由于阀门的开启和关闭经常会产生水锤现象。
    • Hitting power study of hydraulic forging hammer based on elastic-viscoplastic body forging
      基于锻件为弹粘塑性体的液压模锻锤打击力研究
    • Chapter two describes the basic equations of water hammer, pump boundary condition of pump stoppage caused by power failure, the boundary condition of upstream and downstream pond and commonly used water hammer measures in long distance water-supply systems.
      第二章阐述水锤的基本方程、事故停泵水锤计算的水泵端边界条件、基本边界条件及长距离供水系统中常用的水锤防护措施。
    • This paper presents a method of dynamic testing on the hitting power of10 ton model forging hammer.
      本文介绍了对十吨模锻锤进行动态测试的方法。
    • This paper introduces a fuzzy governor-based power system stabilizer ( FGPSS) of hydro-turbine generator adopting the elastic water hammer model of hydraulic system and Philips-Heffron model of synchronous generator. Simulation studies are performed through Matlab/ Simulink.
      采用水力系统弹性水击模型和同步发电机Philips-Heffron模型,设计了水轮发电机组调速器侧模糊电力系统稳定器(FGPSS),并应用Matlab/Simulink对其效果进行了仿真研究。
    • Willing to make any sacrifice for personal power, Megatron caused the Hammer to "misfire" upon its return to Cybertron and destroy Cybertron's star-sun.
      宁可牺牲任何个人的力量,威震天在战锤返回塞伯特恩的途中使得它误射并摧毁了塞伯特恩的恒星。